Abstract:A large number of steel truss Bridges were built in China in the early stage, in recent years, according to the maintenance situation and traffic development, these Bridges have entered the maintenance period. Through reconstruction, the life of the bridge can be extended while the service function of the bridge can be optimized. Through the reconstruction of Zhejiang road bridge on Suzhou River in Shanghai, this paper summarizes some experience in the reconstruction of steel truss bridge, and the advantage of EPC mode for management in the bridge reconstruction project, which can be used as a reference for similar projects in the future.