Abstract:Aiming at an industrial building in a soft soil area of Shanghai, a series of measures must be taken to ensure the quality, safety and construction period during the construction of the foundation pit of the main workshop and the adjacent pool, because of the large height difference between the two foundation pits. Combined with the actual construction of the project, this paper analyzes the existing problems and the measures that can be improved. For the foundation pit with a large height difference, but it can"t be supported independently because of the too close distance, the synchronous construction technology is studied and discussed.