Abstract:Under the background of "welcoming the Asian Games, making the new achievements and showing the new attitude" traffic construction, the overall design scheme for the construction of Tongcheng Avenue Expressway is studied. By analyzing the five main control points in the ground road sections and routes of Tongcheng Avenue Expressway, the alignment of expressway is determined. The overall scheme of the project is studied from three aspects of the overall layout of interchange, regional layout of ramps and layout of ground roads (auxiliary roads). The relationship between the expressway and the main lands and buildings along the expressway as well as the mutual relationship with the subway is analyzed in detail, and the relevant countermeasures are proposed.