Abstract:Combined with the example of the water traffic organization for the construction of 20 bridges spanning the waterway in Dalu Line Channel Regulation Phase II Project, the specific traffic organization measures taken for this project are expounded in detail, including the introduction of a third party warning unit, the setup of temporary berthing space, the establishment of water traffic safety management system, the deployment of the overall scheme for water traffic, the setup of water navigation safety signs, and the preparation of safety emergency plan. These measures have played an important role in the smooth progress of the Dalu Line Project, and can provide the reference and experience for the water traffic organization of multi-bridge construction in the inland waterway in the future, which have the extensive promotion value.