Abstract:Aiming at the problems of low construction standards, low traffic efficiency and frequent traffic accidents of the current G107, the overall scheme of the express reconstruction of G107 in Dongxihu District of Wuhan studied. Based on the functional orientation, service objects and technical standards of the road, combined with the analysis on the planning conditions, construction conditions and traffic volume prediction, the overall scheme of the expressway is studied and determined. The key node schemes for the interchange and the intersection of "one ditch and two roads" are specially expounded.