Abstract:With the basic connection of Suzhou River in 2020, there are still difficulties of low elevation behind the flood control wall, no hinterland lifting waterfront space and landscape vision blocked by hard flood control wall in the next stage of upgrading the quality. Based on the statistics of the current elevation distribution of Suzhou River (Changshou Road bridge - Henan Road bridge), the reconstruction scheme of glass flood control wall on Suzhou River is proposed, and the strength and stability of glass flood control wall are simulated. Combined with the reconstruction process of the glass flood control wall on Huangpu River, the application difficulties of glass flood control wall are analyzed, and the flood prevention emergency plan and daily maintenance requirements for glass flood wall are put forward, which provides the reference for the reconstruction of waterfront space in Shanghai.