Abstract:Relying on the project of Jingshan River Bridge, the structural stress and deformation in the incremental launching construction of steel girder are studied. The incremental launching construction process is simulated by means of numerical simulation, and the stress state of each segment model in the process is analyzed. The local stress performance of the steel box girder is specially analyzed under the influence of multi parameters such as cushion block, lateral offset, local support and so on. A multi-scale three-dimensional finite element model is established. The mechanical state and stability of the steel box girder structure are parametrically analyzed. The reasonable parameter range is determined. The lateral correction threshold is clarified. The deviation correction frequency is controlled. The safety and reliability of the structure before and after the completion of the bridge are ensured.