Abstract:Combined with the design example of Hengqin Port Lianhua Bridge Reconstruction Project, the comparison and selection of the design and construction schemes of the minor-radius bridges in the complex environment are introduced. The integrated structural scheme and the suitable construction scheme of using the composite girder and using the steel box girder when locally spanning the temporarily retained ramps are put forward, which has the certain referring values for the design of the similar minor-radius bridges.