Abstract:The BIM forward design of node bridge is carried out by using Midas CIM bridge 3D forward design software, relying on the main line overpass project from Puyang to Liaocheng Expressway Weicheng Hub, and based on 3D reality model. The key indexes of steel box girder output by 3D model are analyzed and compared with the results output by the traditional 2D design model. The result shows that the result of 3D forward design is reliable and the digital delivery of the BIM model in the design stage to the construction stage can be realized.