Abstract:With the rapid development of urban rail construction, the underpass engineering in subway construction is becoming more and more complicated, especially the large-diameter water distribution or drainage pipeline in a close distance. It is necessary to ensure the safety of not only the construction shield interval and pipeline, but also the safety of both after subway operation. Therefore, it is very important to analyze the impact of shield excavation on existing pipelines. Combined with the project of Shenyang metro siding, using finite element software MIDAS GTS simulation of subway shield tunneling on the influence of large diameter water distribution line, and through the field monitoring results validate the result of the calculation.After comparison and analysis, to verify the effectiveness of the measures taken are reasonable and reliable, and provides a beneficial reference for the future of shield interval undercrossing water distribution pipeline.