Abstract:For the core of large or super large cities, the method to build the underground tunnel in order to ease the traffic pressure has already become the most helpless solution for the urban construction, economic development and traffic congestion. However, due to the limitations of the surrounding environmental conditions, the construction method of this kind of tunnel basically remains in the most traditional construction technology. The construction period of tunnel is long, the environmental impact is large, and the construction investment and loss are also large. The appearance and application of integral assembled structure can effectively solve the above problems. Combined with the integral structure test section of Section II of the rapid reconstruction project of Wuning Road, the street form of integral assembled structure is analyzed and designed in order to promote the application of integral assembled structure in the other excavated tunnel projects, and provide some reference for the subsequent related projects.