Abstract:With the further development of urbanization and the rapid construction of road engineering, the importance of some buildings is not considered in the design stage of many urban road projects, and the study of design scheme is not detailed enough, resulting in the difficulty of project implementation or extremely slow progress. First of all, the engineering overview and construction conditions of North Huancheng Road, and the related situations of Longevity Temple and Guhezhou Distillery in Linxia City are introduced. Then combined with the characteristics of the project, aiming at four schemes of viaduct, excavated channel, mined tunnel and grade crossing proposed for this section, the advantages and disadvantages of the four schemes are analyzed from the difficulties of engineering construction, the impact of the environment along the line, the later-period management, the engineering cost and the impact on Longevity Temple and Guhezhou Distillery. Finally, the viaduct scheme is recommended. The recommended scheme is being implemented after the review of the construction drawings, which can provide some references for the engineering design of similar urban roads crossing important buildings.