Abstract:In order to improve the water environment and guarantee the water security, the solution of pumping station and sluice co-construction is usually adopted for some urban rivers constrained a lot. The site selection of hydro-junction project is directly related to the investment and benefits of its whole life cycle. Taking Tongqi Canal Hydro-junction in Nantong as an example, based on the requirements to meet its own functions, the overall construction planning of the area is coordinated. Combined with the tow-dimensional flow mathematical model, the distribution of the flow state and velocity is validated, the engineering location is studied in detail and the optimal solution of engineering construction is explored.