Abstract:The bridge bored cast-in-place pile with positive and negative circulation rotary drilling technology generates a large amount of waste mud during construction. The traditional treatment methods, such as direct discharge, on-site landfill and centralized outward transportation, will have a great impact on the environment. The waste mud filter pressing, solidification and reuse treatment technology is selected, and the comparison of equipment selection, filter pressing, solidification process and reuse are analyzed, This process can avoid pollution to the environment and occupation of land resources caused by the traditional treatment of waste mud, reduce the project cost, improve the construction progress, realize the reuse of waste mud from pile foundation construction, and conform to the concept of high-quality green construction.