Abstract:The common special-shaped pier forms are introduced. The structural reconstruction and the slingshot pier with the more complex force are selected to carry out the design. The design method and matters needing attention for this kind of pier are put forward. Taking the special-shaped piers in Shenzhen Metro Line 6 as the study background, the beam element and solid element are analyzed with Midas CIVIL and FEA. The reference scheme of common reinforcement arrangement is proposed. The special attention is paid to the linkage displacement of the upper bridge and the stress concentration at each joint, which has the guiding significance for similar projects.