Abstract:Taking the collecting and distributing system of Suqian High-speed Railway Station as an example, the traffic volume demand and space-time distance expectation of inbound and outbound traffic of high-speed railway station are analyzed. Combined with the construction conditions and traffic characteristics of collecting and distributing system of high-speed railway station, three overall layout schemes of collecting and distributing system in the hub area are studied and analyzed. By comprehensively comparing the main indexes of function, landscape and economy of each scheme, the recommended scheme of "short subway + C-type ramp" is proposed for the collecting and distributing system.