Abstract:The co-construction scheme of pumping station and storage tank and the construction scheme of pipe network under the confined space are systematically discussed by taking the drainage system of Shanghai CBD as an example. Through the rational layout and optimization of the construction space, the layout of the rainwater and sewage pumping station is completed when the land area of the pumping station is only about 60% of the recommended value in Technical Guidelines of Shanghai Municipal Control Detailed Planning. And through the use of longitudinal space, the co-construction of pumping station and storage tank is further realized. By comparing and analyzing, the shield method is used as the construction technology of the combined sewage trunk pipe, which can reduce the number of construction wells on the main road by 50% compared with the traditional jacking method, and relieve the impact on the current traffic.