Abstract:In the process of building the municipal bridges in urban built-up areas, it is often found that there are the underground pipelines not mentioned in the exploration data and drawings at the bridge pile location, or the bridge foundation location directly overlaps with the pipe location, or the bridge foundation construction may cause multiple adverse effects on the existing pipelines, etc. If not handled in time, it will greatly affect the project progress and cost. The method of solving this dilemma is discussed from the perspective of supervision engineers through engineering examples, hoping to provide the different solutions for similar situations in the project.