用地受限时全地下污水厂建设方案的思考
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    无锡市人口和经济的迅猛增长致使某污水处理厂近年来始终处于满负荷运行,为解决这一隐患,该污水处理厂开展三期扩建工程,建成后近期污水处理规模将由现状的15万m3/d增至25万m3/d,满足2025年规划的要求。为打造具有鲜明时代特征的现代化污水厂,三期污水厂采用预处理+AAOA+MBR+气浮+消毒”工艺流程,并辅以多项低碳环保设计理念。本文将近远期情况相结合,介绍了现状污水厂的基本情况、运行工况和三期扩建工程规划,并合理展望未来预留空间的利用。

    Abstract:

    In order to solve the hidden danger beneath Wuxi's rapid population and economic growth, that a sewage treatment plant has been running at full capacity in recent years, the sewage treatment plant has carried out a third-phase expansion project, and the sewage treatment scale will increase from the current 150,000 m3/d to 250,000 m3/d in the near future, meeting the requirements of the 2025 plan. In order to build a modern sewage plant with distinctive characteristics of the times, the third phase sewage plant adopts the "pretreatment + AAOA+MBR + air flotation + disinfection" process, supplemented by a number of low-carbon and environmental protection design concepts. This paper combines the near-long-term situation to introduce the basic situation, operating conditions and third-phase expansion project planning of the current sewage plant, and reasonably looks forward to the use of reserved space in the future.

    参考文献
    相似文献
    引证文献
引用本文

徐菁.用地受限时全地下污水厂建设方案的思考[J].城市道桥与防洪,2023,(3):120-124.

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2022-11-16
  • 最后修改日期:2022-11-21
  • 录用日期:2022-12-03
  • 在线发布日期: 2023-04-09
  • 出版日期:
关闭