Abstract:The main bridge of Yazuiyan Bridge in Huaihua is a curve single-pylon double-plane hybrid girder cable-stayed bridge with span arrangement of (200+74+45) m. The structural system of the bridge, the structural style of the main pylon, the structural styles of main span and main girder, and the weight setting of main girder are studied, and the spatial finite element model is established to analyze the structure. The results show that the application of the new combined rigid-frame system of solidifying the inclined leg and the main girder, and setting the supports at the main pylon can significantly optimize the overall stress of the structure. The steel-concrete composite structure is used for the main pylon, and the main girder is the hybrid girder structure, which can improve the durability of the structure and also reduce the engineering cost. The weights of the main girder are set at the consolidation of the inclined leg and the main girder, which is helpful to reduce the unbalanced bending moment of the pylon bottom and improve the stress of the inclined leg and foundation.