蒲丹快速路新建工程桥梁设计要点分析
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Analysis on Design Essentials of Bridges in New Project of Pudan Expressway
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    蒲丹快速路(S401线蒲江绕城段)新建工程属于比较典型的山区公路工程,其特点主要表现为地面高差大、山高沟深,变化频繁。本文主要介绍了项目的设计概况及桥梁设计要点。重点论述了本项目中装配式桥梁结构的应用、控制性节点工程的优化设计、京昆高速(成雅段)渡线工程设计、上跨蒲江河段桥梁结构设计、桥梁结构抗震措施的设计及桥台陡坡段边坡的防护设计。本工程的桥梁设计经验可为今后相关工程提供参考及借鉴。

    Abstract:

    The new project of Pudan Expressway (Pujiang Ring Road of S401 Line) is a typical mountain highway project, which is characterized by the large ground elevation difference, high mountains and deep ditches, and frequent changes. The design overview of the project and the design essentials of the bridge are mainly introduced. The application of prefabricated bridge structure, optimization design of control node engineering, design of Beijing-Kunming Expressway (Chengya Section) Crossover Project, design of bridge structure spanning the section of Pujiang River, design of bridge structure anti-seismic measures and protection design of abutment steep slope section are mainly discussed.

    参考文献
    相似文献
    引证文献
引用本文

钟慧,胡方健.蒲丹快速路新建工程桥梁设计要点分析[J].城市道桥与防洪,2023,(12):61-64,83.

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2022-12-20
  • 最后修改日期:2022-12-20
  • 录用日期:2023-01-30
  • 在线发布日期: 2023-12-25
  • 出版日期:
关闭