Abstract:Aiming at the problems that the general target of the annual runoff total control rate and the accessibility demonstration of the specific projetc control target in sponge city construction area are not suffictient, on the basis of analyzing the land use feature information in detail, the mathematical model is used to conduct several rounds of simulation trial calculation. A decompostion method of annual runoff total control rate index is built based on the 'dual objective up-to-standard analysis' of the overall goal and the project control goal of the area, to conduct the guideline index trial calculation of sponge project and to determine the sponge index decomposition system. Taking Cangzhou in Hebei as an example, a decomposition system of the annual runoff total control rate index in Cangzhou that meets the national requirements and regional characteristics is built, which provides the experience and reference for the index decomposition in the preparation of the sponge planning in the other cities of China.