Abstract:Compared with the traditional pile-sinking technology, the high frequency non-resonance construction method has the advantages of high construction efficiency, less noise pollution, less mud pollution, less influence on the surrounding environment and wide range of geological application. But there is less study of construction influence on the adjacent subway. Relying on Middle Yanggao Road Reconstruction Project, the in-situ monitoring test is carried out near the pile position close to the subway. The influence of high frequency non-resonance pile-sinking construction on the environment around the piles is analyzed to ensure the safety of subway operation.