With the increase of the application of segment lining method in trenchless repair of drainage pipelines, it is necessary to solve the technical problems in the construction process and strengthen the quality control management of the construction process to ensure the construction quality. Combined with the repair project of main sewage drainage pipe and additional facilities in Fengxian District of Shanghai, the technical principle and construction process of the segment lining method are introduced. Various quality problems commonly happened in the construction process of the segment lining method are listed and the causes are analyzed in depth. The targeted and operable control measures are proposed according to the previous engineering construction experience. Finally, the construction quality control and acceptance requirements are given.