In recent years, with the rapid development of the national economy, the construction of urban infrastructure has advanced by leaps and bounds, and the construction of urban utility tunnel has ushered in a new construction climax. But the construction level of utility tunnel is uneven, and the construction sequence of the utility tunnel with the surrounding projects is wrong, which cause the frequent engineering diseases outside the utility tunnel. The treatment scheme of road collapse caused by the false filling on both sides of the utility tunnel is studied. Three treatment schemes of pressure grouting method, dynamic consolidation and excavation placement method in layers are compared. The applicability and economy of the three schemes are summarized, which provide the useful reference for the treatment of road collapse of utility tunnel.