Abstract:The V-shaped continuous rigid-frame bridge with the large rigidity and reasonable stress can effectively reduce the building height of the main girder, and increase the spanning capacity of the main girder to some extent. Taking the V-shaped pier continuous rigid-frame bridge crossing Jingxiang River in Chengbei Expressway of Jingzhou City as the study object, the reasonable sequence of bracket erection, segmenting and pouring in the construction of V-shaped piers are analyzed. The bridge construction is successfully completed by the scheme optimization, process monitoring and other means to enhance the construction quality and construction efficiency. This method has some referring values in the construction of V-shaped pier rigid-frame bridges.