Abstract:As the first medium traffic volume line in China to use hydrogen energy power, its successful implementation needs to be comprehensively considered from five aspects of passenger flow, road, operation, line network and vehicles. First of all, through sorting out the bus passenger flow, the route direction and station layout of the medium traffic volume in Lingang are determined Secondly, through the analysis of the current road conditions, the lane section layout scheme and intersection node optimization scheme are proposed. According to the construction progress and operation requirements, the feasible operation organization scheme is put forward. Thirdly, the conventional public transit line network is optimized to further improve the use efficiency of exclusive lanes. Finally, a new digital track rubber wheel tram is used to construct the on-time travel network of multi-mode public transportation in Lingang.