Abstract:Taking the Jinchao Avenue Upgrading and Reconstruction Project as an example and combined with the functional positioning of the project, the cross section of road is re-arranged. On the basis of evaluating the old road conditions in detail, the asphalt overlay scheme is proposed. The design scheme of the asphalt overlay is specially discussed when the cross section of road is re-arranged. The selection of asphalt overlay material, thickness selection, setting of intermediate layer and overlap of binding wide plate are analyzed respectively, and the specific methods are proposed, which provides the reference for similar projects in the future.