Abstract:The arch bridges in mountainous areas are often installed by the cable hoisting cable-stayed buckle-hanged method without supports. The reasonable arrangement of cable hoisting system plays an important role in the cost, construction period and risk control of the whole project. Combined with the unique construction environment of Suba Bridge, the arch rib is installed by the hoisting and buckle separation system. The stress is clear. At the same time, fully utilizing the site terrain conditions and based on the idea of permanent and temporary combination, the hoisting and buckle tower foundation and the anchoring system are cleverly designed to greatly save the construction period and reduce the cost. In addition, the system of self-propelled cable holder without auxiliary measures is developed, which realizes the non-power walking of cable holder and solves the problems of rope sagging and winding. Through a series of research, it is expected to provide reference for the design and construction of the cable hoisting system of the long-span arch bridge in mountainous areas.