Abstract:The general situation, classification of water supply and drainage system involved and selection of system design parameters of SSSG-Tender 1 Station Project in the new built railway station-front project from Shenzhen to Shenzhen-Shanwei Cooperation Zone are described. The applicability to adopt the full-pipe pressure flow roof rainwater system or semi-pressure flow roof rainwater system for the large spatial buildings of the station is calculated and analyzed. Combined with the comparison results of the main control parameters of the flow of the rainwater drainage ditch, the section shape and section parameters of outdoor drainage ditch are more reasonably selected to achieve the more optimized drainage effect.