Abstract:Light fillers are usually used to fill the subgrade for reducing the settlement of subgrade. The common fillers are fly-ash, geofoam plastic and foamed lightweight soil. Through an engineering example, the filling methods of the three materials in the embankment are introduced. Combined with the post-construction settlements and engineering costs of the different embankment heights and the different fillers, the engineering design schemes are compared and selected.