Abstract:Beixi Diversion Trunk Channel is the main water supply canal of Xiamen. Considering the need of land planning and the necessity of water supply upgrading, the Maluanwan Section of the trunk canal is upgraded and reconstructed. The water supply scale of the trunk canal is 16 m3/s, and the section form is a double-hole reinforced concrete box culvert. The trunk canal is divided into four sections according to the strong adaptability of section design to the foundation, the easy connection with the old and original box culverts and the other principles. Its finite element calculation and analysis are carried out. The relevant internal force and anti-floating effect of box culvert are calculated.