Abstract:In order to implement the requirements of relevant documents and guidelines of the Ministry of Housing and Urban-Rural Development on improving the quality and efficiency of sewage system and treating the black and smelly water bodies, aiming at the problems of complex system and unclear base in the troubleshooting work of combined sewage pipe network in mountainous country, through the analysis and research of the preliminary work such as the basic data, site survey, feedback from construction and maintenance units, system analysis, risk prediction, and the proposed reconstruction scheme of the pipe network, the key identification and troubleshooting positions of the sewage pipe network are listed in the three stages of measurement recheck, defect detection, water quality and quantity analysis, which improves the troubleshooting efficiency of pipe network and the accuracy of the implementation schemes and measures for improving the quality and efficiency in the later stage.