Abstract:Dongting Lake Bridge in Hangzhou - Ruili Expressway is located on the water channel of Yangtze River. The bridge is designed as a double-pylon double-span steel truss girder suspension bridge. The span combination of the main bridge is 460 m+1 480 m+491 m. The main bridge is a steel truss girder structure. The cable crane is used to hoist the steel truss girder. Limited by the field navigation and the hoisting capacity of tower crane, the cable crane is difficult to install on site. Therefore, it is necessary to study the loose assembly installation process scheme of the cable crane on the main cable of the bridge. The installation ideas, essentials, difficulties, installation process and step scheme of LZDJG5000 cable crane in the construction site are introduced, which provides a reference for the similar projects.