Abstract:In order to further control the regional non-point source pollution and reduce the runoff pollution, the construction of initial rainwater storage tank in the rainwater drainage system can ensure the initial rainwater not directly discharged into the river, which realizes the regional pollution control, improve the quality of the regional water environment and play a certain positive role in the improvement of the regional ecological environment. Taking the design of the Jiuxing Initial Rainwater Storage Tank (Xingbei Road) as an example, by comparing and analyzing the commonly used gravity flow inflow mode and pump lifting inflow mode, the appropriate inflow mode is selected. Combined with the location of Jiuxing Initial Rainwater Storage Tank (Xingbei Road) and the current drainage pipeline network around it, the capacity of downstream receiving water body should be rechecked and the operation mode is introduced, which provides the technical references for the design and operation management of similar projects.