Abstract:The road settlement will be caused when an underground structure crosses a operating road, which will seriously affect the driving safety and comfort. In order to ensure the road traffic, the installation of temporary steel structure cover plate is widely used in municipal engineering. The construction of a subway crossing in Beijing caused the settlement of the road, so the temporary steel structure cover plate was installed. Taking the design and construction of temporary steel structure cover plate of this project as an example, the standardized design and construction technology of steel structure cover plate for the road settlement are proposed. After checked and calculated, the maximum stress and the maximum deflection of the structure all meet the standard requirements. The settlement caused by a subway crossing is effectively solved.