Abstract:Huaxia Elevated Road is a fast north channel serving Pudong Airport. During the construction process, some ramps do not meet the implementation conditions and have not been implemented, and no ramps are constructed in Chuansha. As a result, Huaxia Elevated Road cannot serve Chuansha effectively. In order to perfect the functionality of the high-speed expressway network, promote the service level of the channel, improve the traffic conditions in the Chuansha and meet the new round of overall planning for the urban sub-center function positioning of Chuansha, the ramps are considered to add on Huaxia Elevated Road. The scheme study is focused on adding the on-off ramps in Chuansha. The schemes are compared, selected and recommended from the aspects of traffic function, service capacity, construction scale, social impact and engineering investment in order to provide the reference for the projects of adding ramps in expressway reconstruction.