In order to improve the construction efficiency of wet joints of on-site bridge decks, combined with the existing projects and based on the idea of industrial construction, the structural type of wet joints of precast concrete bridge decks without supporting mold is studied. Three types of wet joints of precast concrete bridge deck without supporting mold are proposed. The finite element is used to simulate, compare and analyze the three schemes, and discuss the feasibility of wet joints of precast concrete bridge deck without the supporting mold. The study results show that the stress level of precast bridge deck is better and the bearing capacity meets the structural requirements if Scheme II is used (bottom support with chamfer). Scheme II is recommended, which is conducive to the rapid and simplified construction and is in line with the current development trend of assembly.