Abstract:In order to select the optimal composite structure of steel deck paving of Chongqing Lijiatuo Yangtze River Double Line Bridge, the pavement performances of four common paving structures of steel bridge deck are studied, including double-layer modified elasticity modified asphalt, poured asphalt concrete + high elasticity modified asphalt, double-layer epoxy asphalt concrete, lower epoxy asphalt concrete + upper high elasticity modified asphalt. According to the service conditions and design requirements of the Lijiatuo Double-line Yangtze River Bridge in Chongqing, the pavement performances of the above four paving structures are evaluated. The result shows that the paving structure of the lower epoxy asphalt concrete + upper high-elasticity modified asphalt have the excellent performances in high temperature performance, anti-slip performance and bonding performance, which is the most suitable scheme for the steel deck pavement of Lijiatuo Double-line Bridge.