Abstract:The Pingsha-Nanshui Area of Zhuhai City is surrounded by mountains and facing the sea. In the north, it is close to Margi Mountain. In the south, it is hilly and platform landform type with vast land and developed water system. There are the basin flooding and waterlogging problems, and also the interwoven problem of storm surge invasion "flood", "waterlogging" and "tide". Aiming at the problem of external flood tide, the upgrading of external seawall system has been in the process of implementation. In view of the internal waterlogging control problem, the "zoning defense, storage and drainage" waterlogging control system is constructed. Combined with the features of landform, river system and flood waterlogging tide, the safety precautions such as the joint control of flood, waterlogging and tide, the implementation of retaining, storage and drainage together, and the prevention and control of flood, waterlogging and tide are taken. Through the internal river, ecological storage, external discharge Class I pumping station, the storage and discharge relationship is reasonably coordinated to ensure the safety of the area, which provides a useful reference for Zhuhai and the other coastal areas.