Abstract:Based on the planning and development, and the facility supply upward planning, the traffic flow of the river crossing is predicted at three levels of province, urban integration and municipal area. The construction of intercity river crossings is costly. Firstly, it is necessary to consider the transportation function. The river crossing is generally located in urban areas with high building density. The status quo analysis using BIM and drone tilt photography technology can provide more intuitive data analysis for the selection of alignment so as to provide the data support for the selection of alignment. For the important nodes crossed by multiple forks, the form of interchanges should be simplified. The mainstream traffic is specially solved. The traffic problems are solved through the form of multiple nodes complementing each other, which try not to focus on one point to solve the problem, and avoid the formation of traffic congestion black spots.