Abstract:In the last decade, the construction of utility tunnel has been continuously increasing. While promoting the construction of utility tunnel, many new problems have also been identified. The overlap between the planning of utility tunnel and pipeline frequently occurs in different regions, resulting in too much uncertainty in the types and scales of pipeline into utility tunnel. Therefore, it is necessary to demonstrate based on the actual situation. The pipeline follows the principle of all into utility tunnel. Under the condition of determining the pipeline into utility tunnel, it is necessary to optimize the structural size of the utility tunnel. The internal space of the utility tunnel should be fully utilized and the underground space of road should be intensively used to maximize the effectiveness of the utility tunnel. In addition, the layout position of the utility tunnel in the cross section of the road should be also a key consideration. The pipelines into utility tunnel should be convenient for the use of surrounding plots. So the layout position of utility tunnel should be fully demonstrated to facilitate the connection of pipelines and the use of users. At the same time, it is also necessary to minimize the impact of protruding structures of the utility tunnel on vehicles and pedestrians. The design of the utility tunnel project in Xinfengsha Avenue is described and further analyzed. The future development of utility tunnel is expected in detail.