Abstract:The municipal road to be reconstructed and extended needs to cross the current expressway, and also involves the current expressway toll station, which needs to be connected with the traffic entering and exiting the toll station. In order to ensure that the scale of the crossing point lane is not affected, and to improve the congestion problem at the entrance and exit of the reconstructed road and toll station, the design scheme achieves the road widening through the multiple means, while ensuring that the daily operation of highway is not affected, which can provide some reference for similar projects.