Abstract:Taking Jinan Jiluo Road Yellow River Tunnel Project and Yellow River Avenue Expressway Phase I Project as the examples, the co-construction section schemes of underpass and rail transit with two construction methods of shield and excavation are studied. By analyzing the advantages and disadvantages of the different spatial relationship compositions, the application scenes with the different co-construction section schemes are achieved. The study effects can be referred for the similar projects.