Abstract:With the acceleration of urbanization, the urban roads inevitably face various complex boundary conditions and limiting factors in the construction process. It is particularly important to systematically analyze the impact of various limiting factors on the engineering design schemes and reasonably optimize the design schemes. Combined with the Hanjiang Avenue (Changqing Road ~ Jianshe Avenue) Project in Wuhan City, the design essentials of boundary conditions and limiting factors of the project are analyzed. The corresponding design strategies are proposed for the organic integration of long-distance large-width ecological landscape belts and urban elevated bridges, and the section layout of the urban elevated bridges in the restricted section of the military administration area in order to provide the reference for the similar projects in the future.