Abstract:In the design of small box beam hidden bent cap, the temporary brackets are used to support the small box beam to the pouring position during construction because the bent cap is removed. Therefore, before the completion of the construction of the bridge span structure, the weight of all superstructures needs to be borne by the temporary bracket structure. Based on the Zhejiang Province Ningbo South Ring Road West Extension Project, aiming at the problems of poor foundation bearing capacity, heavy girder weight and long bent cap span in the process of construction, a temporary bracket system suitable for the construction of small box beam hidden bent cap in soft soil foundation has been developed through the comparison of different temporary bracket systems. The temporary bracket is installed between the existing base slabs on the expressway in this system. The main body of the bracket is a recyclable steel structure. There are significant advantages in construction period and engineering cost. On the basis of meeting the requirements of effective, safe and reliable construction, this system can effectively control the settlement of the construction area, control the uneven settlement of the overall structure, and reduce the total settlement.