Abstract:Based on the measured temperature date in the construction site of Huazizha Pumping Station, the thermal parameters of pumping station to pump the concrete are inversely analyzed by the finite element fine simulation analysis model of temperature field of mass concrete structure and the genetic optimization algorithm to obtain the thermal characteristic parameters of concrete. And then the feedback analysis on the whole calculation domain is carried out according to the actual construction situation. The result shows that the calculation value is closer to the measured value, which reflects the actual temperature change process of concrete during construction period better so as to guide the practical construction. The temperature control and crack prevention measures of Huazizha Pumping Station Project have played the expected anti-cracking role and achieved a good anti-cracking effect.