Abstract:Taking the Zibo Zhongrun Avenue Utility Tunnel Project as the research object, the foundation pit supporting technology for the machine head working shaft in the implementation process of the utility tunnel is introduced. The corresponding strategies are proposed for the previous preparation, precautions, safety measures and emergency schemes in the construction process of the machine head working shaft. The construction supporting mode of working shaft in the limited working space can ensure the safety of subsequent engineering construction. The relevant experience can be used as the referring basis for the similar projects.