Abstract:Taking a utility tunnel in the northern area as an example, the control requirements for a utility tunnel under construction crossing the existing high-grade important municipal pipelines and the selection of relevant implementation schemes are studied. At the same time, a series of suggestions and requirements are putted forward for the relevant pipe jacking construction control technology in the implementation process, which provides some experience for similar engineering cases and hopes to play some roles for the related engineering designs.