Abstract:Taking the design scheme of Xincheng Road Cross-river Passage in Hangzhou as an example, the current planning conditions of the scheme are studied. The predictive analysis is carried out according to the functional orientation and traffic flow. By comparing and selecting the schemes, the construction form is demonstrated. The construction scale is demonstrated from two levels of qualitative analysis and flow prediction. The overall design scheme is expounded from three aspects of overall scheme, cross-section layout and important nodes of the project. The main research conclusions are that(1)the tunnel form is suitably used for the cross-river passage. (2)the double-way six-lane section form (double-way 4-lane for the main line + continuously emergency parking strip at two sides) is recommended for the cross-river passage.(3)it is necessary to set up the slow traffic passage. It is suggested that it should be realized in the long-term urban rapid transformation of Xiasha Bridge.